Хайлт

2.1.1 Pre-Design Studies, Detailed Design And Supervision Services (EXPIRED)

Сонирхлын илэрхийллийг хvсэх

Ерєнхий мэдээлэл

Тонга
   TO-MOH-449646-CS-QCBS
   2024 оны 11 сарын 14 єдєр
2024 оны 11 сарын 25 єдєр
  
Ministry of Health
   Англи
   Бусад
   нийтэлсэн: 2024 оны 11 сарын 14 єдєр

Харилцах мэдээлэл

   Semisi Fukofuka
Ministry of Health
Ministry of Health, Taufa'ahau Rd, Tofoa, Tonga
Тонга
   +676 779 8614
   Энд дар

Санхvvжилт

Зам барилгын зєвлєх үйлчилгээ

Additional resources

Товчлол

      

notice_summary_english: Detailed Design & Construction Supervision Services (DnS) for Tonga North Islands Group Healthcare Facilities
Reference No: TO-MOH-449646-CS-QCBS
The Ministry of Health (MoH) of the Kingdom of Tonga is expected to receive financing from the World Bank toward the cost of the Health Enhancement and Resiliency in Tonga Project (HEART) and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include the “Detailed Design & Supervision Services for Tonga North Islands Group Healthcare Facilities” to perform the following tasks in 3 Phases, but not limited to:
PHASE 1: Pre-Design Assessments & Studies for Northern Islands (Lump-Sum, 12 Months)
Master Planning 7+ hectares of the Prince Wellington Ngu Hospital (PWNH) site for the next 10 years of development;
Performing rapid and detailed assessments of 24 existing buildings at PWNH;
Preparing Environmental and Social due diligence documents for Project Component 2;
Assessing, planning, and preparing medical equipment/supply specifications and bid documents for PWNH and Northern Island CHCs and Nursing Clinics in Vava’u and Niua Island Group (6 facilities);
Assessing ICT and digital connectivity for PWNH and Northern Island CHCs and Nursing Clinic in Vava’u and Niua Island Group (6 facilities and including Vaiola Hospital in Nuku’alofa);
PHASE 2: Detailed Design of PWNH Hospital Facility (Lump-Sum, 15 months)
Providing detailed architectural and engineering studies, design, costings, plan, and prepare bid documents for a new 3600sqm hospital and new medical staff quarters at PWNH & the upgrade, retrofit, and/or strengthening of select existing buildings at PWNH;
Preparing Operations & Maintenance plans;
Providing Procurement Support;
PHASE 3: Construction Supervision and Monitoring of PWNH facility (Time-Based, not to exceed a maximum, 24 months)
Providing construction supervision and monitoring services for the development of PWNH.
The total level

Жинхэнэ текст


More information: Энд дар
Энэхvv анхааруулга нь зєвхєн мэдээллийн чанартай болохыг анхаарна уу.
Бид вэб сайтынхаа мэдээллийн vнэн зєв байдал, шинэчлэлтийг сайжруулахыг эрмэлзэж байгаа ч манай бvх мэдээлэл алдаагvй хэмээн баталж чадахгvй.
Танд энэ анхааруулгыг сайжруулах, єєрчлєхтэй холбоотой дурын санал байвал бидэнд ирvvлнэ vv.